Managing Risk & Out of Scope Work
Conittel recognises that a contract is a living contract. The Conittel methodology assumes that the dynamic requirement of a contract will change during the life of a project and enables most of these future changes to be costed into the 'up front' contract.
Criteria for Success
Conittel methodology ensures that all parties sign up to an agreed criteria by which the success of the project will be measured.
© 2001 Email:conittel@which.net